Ash Mesa blends solar with crypto, utilizing a 9.9 MW DC solar field to power 6 MW of crypto buildings and 1,602 miners. This successful project in Olathe, Colorado. The s ite geology required pre-drilling through cobblestone and boulders, while the lack of northbound site access compelled E Light to oversee construction of a bridge. Without missing a beat, the team developed a prototype crypto building alongside the owner.

As EPC contractor, E Light managed subcontractors for civil work, module racking, concrete foundations, and building erections. Our team self-performed the entire electrical scope–64 string inverters with SCADA control, 12 ATI tracker arrays, and module install. The on-site crew prepared three 4,000-amp services, and the prefab team provided 30, 600-amp panels and 1,620 circuits for racking.