General Contractor:
Juwi
Engineer:
Juwi
Architect:
Juwi

Bison Solar is a 36.31 MW photovoltaic electricity generated facility located north of Wellington, Colorado. The project spans nearly 250 acres. E Light is installing the PV Modules and the electrical on this project. The site is located adjacent to the Rawhide Energy Plant.