Encompassing 500 acres in Liverpool TX, the 113 MW DC Longbow Solar Facility is complete! Highlights of the project include, moving 770,000 cubic yards of material, stabilizing roadways with 2,000 tons of lime, installing 1,988 ATI trackers and 38,000 foundation piles. As Prime Contractor, E Light managed the entirety of this project and self-installed 25,000 feet of medium voltage cable, 25 Sungrow inverters, and 208,000 PV modules.