General Contractor:
E Light Wind and Solar, Inc.
Engineer:
HDR
Architect:
SunEdison, LLC

This project includes the installation of a 10.8 MW DC solar photovoltaic system. The system is grid-tied and ground-mounted. The panels are installed on a single-axis tracker system.