General Contractor:
Moss & AssociatesEngineer:
RMTArchitect:
SunPower Corporation![NC-PV-1](https://elightelectric.com/wp-content/uploads/2020/11/NC-PV-1-1.jpg)
![Dolphin-1](https://elightelectric.com/wp-content/uploads/2020/11/Dolphin-1-1.jpg)
![Dolphin-2](https://elightelectric.com/wp-content/uploads/2020/11/Dolphin-2-1.jpg)
![Dolphin-3](https://elightelectric.com/wp-content/uploads/2020/11/Dolphin-3-1.jpg)
![Dolphin-5](https://elightelectric.com/wp-content/uploads/2020/11/Dolphin-5-1.jpg)
Previous
Next
This project is the nation’s largest on-site solar installation at an end user-owned facility. The 171-acre site includes a ground-mount, single-axis tracker installation. The solar photovoltaic system supplies power to a $1 billion dollar existing data center on the site. The scope of work included the installation of driven and drilled piers, erection of the single-axis tracking system, PV module installation, SCADA, and all DC and AC electrical work.