General Contractor:
E Light Wind and Solar, Inc.
Engineer:
Taney Engineering
Architect:
Juwi Solar, Inc.

The 600 kW DC Cactus Garden Solar project consists of 2,112 photovoltaic modules on a 4-acre site and is the largest solar installation by a food manufacturer in Nevada. The Cactus Garden project generates renewable energy for the Ethel M® chocolate facility owned by the Mars Corporation. (Photos courtesy of juwi solar, inc.)