Palmer Solar 80MW

The 80 MW Palmer Solar is located in Fountain, CO. The project is spread across two different locations with solar arrays that are being built simultaneously two miles apart – one on Birdsall Road, and the other on Squirrel Creek Road. Duke Energy is funding the project and will be the owner of the facility. Colorado Springs Utilities will be the off-taker of the energy generated by the array. The Palmer Solar project kicked off in May 2019 and was completed December...

SunStreams 213MW

The 213MW Sunstreams Solar project is located in Arlington, AZ. This is a balance of systems (BOS) project and includes structural installation, module installation, electrical installation, commissioning, and site start up. This six month  has required more than 500 workers to see it...

Antonito II 1.5MW

The Antonito II Solar Project is 1,200KWac capacity and 1,500kWdc Single Axis Tracker Solar Facility. The project is located near Antonito, CO and covers approximately 12 acres in Conejos County. The project will have 4,760 solar panels. E light is providing CM services, DC and MV electrical services, pile and racking installation, equipment signage, perimeter fence, civil work, SCADA install, and commissioning of the facility....
  • Denver 303.754.0001
  • Colorado Springs 719.314.0670

All material presented on this site ©2021 E Light Electric Services, Inc.