General Contractor:
E Light Electric
E Light was the prime contractor on United Power’s 80 MW BESS (Battery Energy Storage Systems) in Weld County, Colorado. Over 5,500 yards of concrete was placed throughout the Colorado winter. All the equipment was dropped right into place with no issues. Winslow crane service supported the E Light team setting the 80,000 lb battery packs and aux equipment.

Leave a Reply

Your email address will not be published. Required fields are marked *