General Contractor:
Mortenson Construction
Engineer:
Carter & Burgess
Architect
RNL Design

This 125,000 square foot light-rail maintenance facility, included over $1,000,000 in site, duct-bank conduits for the catenary electrical system. This facility included industrial lighting, a backup generator system, communication, security, fire detection and lighting protection.