- General Contractor
- Noresco
Installation of a design build / design assist 103 kW photovoltaic (PV) system tied into the main distribution panel in Building U at the complex. This included installation of: the combiner boxes, inverter, DC disconnect, AC disconnect; underground electrical from the AC disconnect; a bi-directional 150A, 3-phase, 480V breaker for the solar field; the string wiring from the PV modules to combiner boxes; and installation of a weather station.